// Questions file created by MCBuilder © Mike Capstick // It is a javascript file of data from a@a.com // questions=new Array(); questions[1]='Effective Listening is~the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.~the mathematical examination of the nature of individual risks on the project~an assessment of the costs of the resources required to complete project activities.~the logical order of tasks that defines the sequence of work in a project.~a decision to produce the product in-house or to purchase from outside sources~A~1~1~
Effective Listening is the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.
Cost Estimate is an assessment of the costs of the resources required to complete project activities.
Impact Analysis is the mathematical examination of the nature of individual risks on the project
Network is the logical order of tasks that defines the sequence of work in a project.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
'; questions[2]='Configuration Management is~the management of change to project deliverables and conformance to requirements~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~a legal document of purchase or sale which is binding on both parties.~a method to facilitate the development of mutual trust, respect, and good working relationships.~an organizational structure in which staff are grouped hierarchically by specialty.~A~1~1~
Configuration Management is the management of change to project deliverables and conformance to requirements
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Active Listening is a method to facilitate the development of mutual trust, respect, and good working relationships.
Functional Organization is an organizational structure in which staff are grouped hierarchically by specialty.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[3]='Statement of Work ,SOW, is~the portion of the product to be contracted.~a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment~a factor that for planning purposes are considered to be true, real, or certain.~a network diagramming technique in which activities are represented by nodes.~a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.~A~1~1~
Statement of Work ,SOW, is the portion of the product to be contracted.
Decision Tree Analysis is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.
Precedence Diagram Method ,PDM, is a network diagramming technique in which activities are represented by nodes.
Control Charts is a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
'; questions[4]='Brainstorming is~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~the management of change to project deliverables and conformance to requirements~the portion of the product to be contracted.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~an assessment of the costs of the resources required to complete project activities.~A~1~1~
Configuration Management is the management of change to project deliverables and conformance to requirements
Statement of Work ,SOW, is the portion of the product to be contracted.
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Cost Estimate is an assessment of the costs of the resources required to complete project activities.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
'; questions[5]='Privity of Contract is~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~a sequence of activities which determines the earliest possible completion of the project.~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~the calculation of late finish and start dates for the uncompleted portions of all network activities.~A~1~1~
Privity of Contract is the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party
Critical Path is a sequence of activities which determines the earliest possible completion of the project.
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
'; questions[6]='Schedule Variance ,SV, is~any difference between the scheduled completion of an activity and the actual completion of that activity.~an assessment of the costs of the resources required to complete project activities.~an approach to project staffing that calls for implementers to be involved in the design phase.~any difference between the scheduled completion of an activity and the actual completion of that activity.~the number of time periods up to the point that the project has turned a profit~A~1~1~
Schedule Variance ,SV, is any difference between the scheduled completion of an activity and the actual completion of that activity.
Cost Estimate is an assessment of the costs of the resources required to complete project activities.
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Payback Period is the number of time periods up to the point that the project has turned a profit
'; questions[7]='Planned Value ,PV, is~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~a sequence of activities which determines the earliest possible completion of the project.~the process of evaluating project performance to provide confidence that the project will meet the relevant standards.~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.~A~1~1~
Planned Value ,PV, is the physical work scheduled, plus the authorized budget to accomplish the scheduled work.
Quality Assurance is the process of evaluating project performance to provide confidence that the project will meet the relevant standards.
Communication Barrier is any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.
Critical Path is a sequence of activities which determines the earliest possible completion of the project.
'; questions[8]='Pareto\'s Law is~a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~the calculation of late finish and start dates for the uncompleted portions of all network activities.~type of power that refers to negative consequences that a person can inflict on others.~a document of the procedures that will be used to manage risk throughout the project~A~1~1~
Pareto\'s Law is a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
'; questions[9]='Quality Assurance is~the process of evaluating project performance to provide confidence that the project will meet the relevant standards.~a legal document of purchase or sale which is binding on both parties.~a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~an analysis to determine if a course of action is possible within the terms of reference of the project~A~1~1~
Pareto\'s Law is a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.
Quality Assurance is the process of evaluating project performance to provide confidence that the project will meet the relevant standards.
Feasibility Study is an analysis to determine if a course of action is possible within the terms of reference of the project
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[10]='Program Evaluation and Review Technique ,PERT, is~an event-oriented network analysis technique used to estimate program duration.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead~the calculation of late finish and start dates for the uncompleted portions of all network activities.~the likelihood of occurrence.~A~1~1~
Program Evaluation and Review Technique ,PERT, is an event-oriented network analysis technique used to estimate program duration.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Authoritarian is a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
Probability is the likelihood of occurrence.
'; questions[11]='Crashing is~a technique in which cost and schedule tradeoffs are analyzed to determine how to obtain the greatest amount of compression for the least extra cost.~a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.~a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~a decision to produce the product in-house or to purchase from outside sources~A~1~1~
Pareto\'s Law is a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.
Crashing is a technique in which cost and schedule tradeoffs are analyzed to determine how to obtain the greatest amount of compression for the least extra cost.
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
Control Charts is a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment
'; questions[12]='Cost Estimate is~an assessment of the costs of the resources required to complete project activities.~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~the number of time periods up to the point that the project has turned a profit~the likelihood of occurrence.~a method to facilitate the development of mutual trust, respect, and good working relationships.~A~1~1~
Privity of Contract is the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party
Cost Estimate is an assessment of the costs of the resources required to complete project activities.
Payback Period is the number of time periods up to the point that the project has turned a profit
Active Listening is a method to facilitate the development of mutual trust, respect, and good working relationships.
Probability is the likelihood of occurrence.
'; questions[13]='Decision Tree Analysis is~a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~an organizational structure in which staff are grouped hierarchically by specialty.~a factor that for planning purposes are considered to be true, real, or certain.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~A~1~1~
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Decision Tree Analysis is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.
Functional Organization is an organizational structure in which staff are grouped hierarchically by specialty.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
'; questions[14]='Communication Barrier is~any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~the calculation of late finish and start dates for the uncompleted portions of all network activities.~A~1~1~
Effective Listening is the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Communication Barrier is any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
'; questions[15]='Impact Analysis is~the mathematical examination of the nature of individual risks on the project~a method to facilitate the development of mutual trust, respect, and good working relationships.~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~a decision to produce the product in-house or to purchase from outside sources~a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.~A~1~1~
Pareto\'s Law is a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.
Impact Analysis is the mathematical examination of the nature of individual risks on the project
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
Active Listening is a method to facilitate the development of mutual trust, respect, and good working relationships.
'; questions[16]='Precedence Diagram Method ,PDM, is~a network diagramming technique in which activities are represented by nodes.~the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.~a method to facilitate the development of mutual trust, respect, and good working relationships.~a factor that for planning purposes are considered to be true, real, or certain.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~A~1~1~
Effective Listening is the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Precedence Diagram Method ,PDM, is a network diagramming technique in which activities are represented by nodes.
Active Listening is a method to facilitate the development of mutual trust, respect, and good working relationships.
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
'; questions[17]='Concurrent Engineering is~an approach to project staffing that calls for implementers to be involved in the design phase.~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~A~1~1~
Planned Value ,PV, is the physical work scheduled, plus the authorized budget to accomplish the scheduled work.
Pareto\'s Law is a principle that a relatively small number of causes will typically produce a large majority of the problems or defects also known as the 80/20 rule.
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
'; questions[18]='Critical Path is~a sequence of activities which determines the earliest possible completion of the project.~an analysis to determine if a course of action is possible within the terms of reference of the project~the portion of the product to be contracted.~any difference between the scheduled completion of an activity and the actual completion of that activity.~the process where an organization will compare its processes, products, performance against other organizations.~A~1~1~
Statement of Work ,SOW, is the portion of the product to be contracted.
Schedule Variance ,SV, is any difference between the scheduled completion of an activity and the actual completion of that activity.
Critical Path is a sequence of activities which determines the earliest possible completion of the project.
Feasibility Study is an analysis to determine if a course of action is possible within the terms of reference of the project
Benchmarking is the process where an organization will compare its processes, products, performance against other organizations.
'; questions[19]='Project Scope is~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~when a large portion of the message is lost from the sender to the receiver.~the mathematical examination of the nature of individual risks on the project~the process of evaluating project performance to provide confidence that the project will meet the relevant standards.~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~A~1~1~
Quality Assurance is the process of evaluating project performance to provide confidence that the project will meet the relevant standards.
Impact Analysis is the mathematical examination of the nature of individual risks on the project
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Filtering is when a large portion of the message is lost from the sender to the receiver.
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
'; questions[20]='Backward Pass is~the calculation of late finish and start dates for the uncompleted portions of all network activities.~a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment~the process where an organization will compare its processes, products, performance against other organizations.~the likelihood of occurrence.~an analysis to determine if a course of action is possible within the terms of reference of the project~A~1~1~
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Feasibility Study is an analysis to determine if a course of action is possible within the terms of reference of the project
Control Charts is a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment
Benchmarking is the process where an organization will compare its processes, products, performance against other organizations.
Probability is the likelihood of occurrence.
'; questions[21]='Filtering is~when a large portion of the message is lost from the sender to the receiver.~the calculation of late finish and start dates for the uncompleted portions of all network activities.~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~the process where an organization will compare its processes, products, performance against other organizations.~the logical order of tasks that defines the sequence of work in a project.~A~1~1~
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Filtering is when a large portion of the message is lost from the sender to the receiver.
Network is the logical order of tasks that defines the sequence of work in a project.
Benchmarking is the process where an organization will compare its processes, products, performance against other organizations.
'; questions[22]='Project Management Team is~the members of the project team who are directly involved in project management activities.~the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~the process concerned with identifying, analyzing, and responding to project risk~a provision in the project plan to mitigate cost and/or schedule risk.~A~1~1~
Effective Listening is the ability to recognize the importance of verbal and nonverbal listening behaviors including body language.
Project Management Team is the members of the project team who are directly involved in project management activities.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
Reserve is a provision in the project plan to mitigate cost and/or schedule risk.
Project Risk Management is the process concerned with identifying, analyzing, and responding to project risk
'; questions[23]='Feasibility Study is~an analysis to determine if a course of action is possible within the terms of reference of the project~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~a decision to produce the product in-house or to purchase from outside sources~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~type of power that refers to negative consequences that a person can inflict on others.~A~1~1~
Feasibility Study is an analysis to determine if a course of action is possible within the terms of reference of the project
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
'; questions[24]='Conception Phase is~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~the calculation of late finish and start dates for the uncompleted portions of all network activities.~an organizational structure in which staff are grouped hierarchically by specialty.~an approach to project staffing that calls for implementers to be involved in the design phase.~A~1~1~
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
Functional Organization is an organizational structure in which staff are grouped hierarchically by specialty.
'; questions[25]='Project Closeout is~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~an event-oriented network analysis technique used to estimate program duration.~a sequence of activities which determines the earliest possible completion of the project.~the number of time periods up to the point that the project has turned a profit~a decision to produce the product in-house or to purchase from outside sources~A~1~1~
Program Evaluation and Review Technique ,PERT, is an event-oriented network analysis technique used to estimate program duration.
Critical Path is a sequence of activities which determines the earliest possible completion of the project.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
Payback Period is the number of time periods up to the point that the project has turned a profit
'; questions[26]='Authoritarian is~a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead~a legal document of purchase or sale which is binding on both parties.~a formal document explains the purpose of the project including the business need and the resulting product.~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~the mathematical examination of the nature of individual risks on the project~A~1~1~
Impact Analysis is the mathematical examination of the nature of individual risks on the project
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Authoritarian is a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead
Project Charter is a formal document explains the purpose of the project including the business need and the resulting product.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[27]='Risk Management Plan is~a document of the procedures that will be used to manage risk throughout the project~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~the likelihood of occurrence.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~type of power that refers to negative consequences that a person can inflict on others.~A~1~1~
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Planned Value ,PV, is the physical work scheduled, plus the authorized budget to accomplish the scheduled work.
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Probability is the likelihood of occurrence.
'; questions[28]='Coercive is~type of power that refers to negative consequences that a person can inflict on others.~a factor that for planning purposes are considered to be true, real, or certain.~an assessment of the costs of the resources required to complete project activities.~a legal document of purchase or sale which is binding on both parties.~the logical order of tasks that defines the sequence of work in a project.~A~1~1~
Cost Estimate is an assessment of the costs of the resources required to complete project activities.
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Network is the logical order of tasks that defines the sequence of work in a project.
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[29]='Network is~the logical order of tasks that defines the sequence of work in a project.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~a document of the procedures that will be used to manage risk throughout the project~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~A~1~1~
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Privity of Contract is the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Network is the logical order of tasks that defines the sequence of work in a project.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
'; questions[30]='Make-or-Buy is~a decision to produce the product in-house or to purchase from outside sources~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.~type of power that refers to negative consequences that a person can inflict on others.~the likelihood of occurrence.~A~1~1~
Communication Barrier is any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
Probability is the likelihood of occurrence.
'; questions[31]='Expectancy Theory is~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~an approach to project staffing that calls for implementers to be involved in the design phase.~the calculation of late finish and start dates for the uncompleted portions of all network activities.~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~the process of evaluating project performance to provide confidence that the project will meet the relevant standards.~A~1~1~
Quality Assurance is the process of evaluating project performance to provide confidence that the project will meet the relevant standards.
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Backward Pass is the calculation of late finish and start dates for the uncompleted portions of all network activities.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
'; questions[32]='Reserve is~a provision in the project plan to mitigate cost and/or schedule risk.~a formal document explains the purpose of the project including the business need and the resulting product.~an event-oriented network analysis technique used to estimate program duration.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.~A~1~1~
Program Evaluation and Review Technique ,PERT, is an event-oriented network analysis technique used to estimate program duration.
Decision Tree Analysis is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.
Reserve is a provision in the project plan to mitigate cost and/or schedule risk.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
Project Charter is a formal document explains the purpose of the project including the business need and the resulting product.
'; questions[33]='Payback Period is~the number of time periods up to the point that the project has turned a profit~type of power that refers to negative consequences that a person can inflict on others.~the portion of the product to be contracted.~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~a technique in which cost and schedule tradeoffs are analyzed to determine how to obtain the greatest amount of compression for the least extra cost.~A~1~1~
Statement of Work ,SOW, is the portion of the product to be contracted.
Planned Value ,PV, is the physical work scheduled, plus the authorized budget to accomplish the scheduled work.
Crashing is a technique in which cost and schedule tradeoffs are analyzed to determine how to obtain the greatest amount of compression for the least extra cost.
Coercive is type of power that refers to negative consequences that a person can inflict on others.
Payback Period is the number of time periods up to the point that the project has turned a profit
'; questions[34]='Active Listening is~a method to facilitate the development of mutual trust, respect, and good working relationships.~a legal document of purchase or sale which is binding on both parties.~a formal document explains the purpose of the project including the business need and the resulting product.~the process of evaluating project performance to provide confidence that the project will meet the relevant standards.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~A~1~1~
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Quality Assurance is the process of evaluating project performance to provide confidence that the project will meet the relevant standards.
Active Listening is a method to facilitate the development of mutual trust, respect, and good working relationships.
Project Charter is a formal document explains the purpose of the project including the business need and the resulting product.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[35]='Functional Organization is~an organizational structure in which staff are grouped hierarchically by specialty.~the number of time periods up to the point that the project has turned a profit~an approach to project staffing that calls for implementers to be involved in the design phase.~any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.~the physical work scheduled, plus the authorized budget to accomplish the scheduled work.~A~1~1~
Planned Value ,PV, is the physical work scheduled, plus the authorized budget to accomplish the scheduled work.
Communication Barrier is any impediment to communication such as noise, cultural differences, organizational climate, perceptions and limited information.
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Payback Period is the number of time periods up to the point that the project has turned a profit
Functional Organization is an organizational structure in which staff are grouped hierarchically by specialty.
'; questions[36]='Control Charts is~a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment~a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.~the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.~A~1~1~
Decision Tree Analysis is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives.
Conception Phase is the phase that triggers and captures new ideas and identifies potential candidates for further development in the feasibility phase.
Expectancy Theory is the view that we expect that we can perform the task at hand and that we expect to obtain rewards for our performance
Control Charts is a graphic display of the results of a process. The charts are used to determine if the process is in need of adjustment
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
'; questions[37]='Chart of Accounts is~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~a sequence of activities which determines the earliest possible completion of the project.~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~a legal document of purchase or sale which is binding on both parties.~A~1~1~
Critical Path is a sequence of activities which determines the earliest possible completion of the project.
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[38]='Project Charter is~a formal document explains the purpose of the project including the business need and the resulting product.~a document of the procedures that will be used to manage risk throughout the project~the full completion of a project signed off by all responsible parties and the finalization of all paperwork.~the logical order of tasks that defines the sequence of work in a project.~the process concerned with identifying, analyzing, and responding to project risk~A~1~1~
Project Closeout is the full completion of a project signed off by all responsible parties and the finalization of all paperwork.
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Network is the logical order of tasks that defines the sequence of work in a project.
Project Charter is a formal document explains the purpose of the project including the business need and the resulting product.
Project Risk Management is the process concerned with identifying, analyzing, and responding to project risk
'; questions[39]='Benchmarking is~the process where an organization will compare its processes, products, performance against other organizations.~a legal document of purchase or sale which is binding on both parties.~a document of the procedures that will be used to manage risk throughout the project~the likelihood of occurrence.~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~A~1~1~
Privity of Contract is the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Benchmarking is the process where an organization will compare its processes, products, performance against other organizations.
Probability is the likelihood of occurrence.
Contract is a legal document of purchase or sale which is binding on both parties.
'; questions[40]='Probability is~the likelihood of occurrence.~an approach to project staffing that calls for implementers to be involved in the design phase.~the mathematical examination of the nature of individual risks on the project~a document of the procedures that will be used to manage risk throughout the project~the process where an organization will compare its processes, products, performance against other organizations.~A~1~1~
Impact Analysis is the mathematical examination of the nature of individual risks on the project
Concurrent Engineering is an approach to project staffing that calls for implementers to be involved in the design phase.
Risk Management Plan is a document of the procedures that will be used to manage risk throughout the project
Benchmarking is the process where an organization will compare its processes, products, performance against other organizations.
Probability is the likelihood of occurrence.
'; questions[41]='Project Risk Management is~the process concerned with identifying, analyzing, and responding to project risk~a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead~the management of change to project deliverables and conformance to requirements~the portion of the product to be contracted.~a factor that for planning purposes are considered to be true, real, or certain.~A~1~1~
Configuration Management is the management of change to project deliverables and conformance to requirements
Statement of Work ,SOW, is the portion of the product to be contracted.
Authoritarian is a form of Leadership where activities are directed from a position of power and without consideration of the views of those being lead
Project Risk Management is the process concerned with identifying, analyzing, and responding to project risk
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
'; questions[42]='Assumption is~a factor that for planning purposes are considered to be true, real, or certain.~the likelihood of occurrence.~a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.~the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party~a decision to produce the product in-house or to purchase from outside sources~A~1~1~
Privity of Contract is the legal relationship between the parties to a contract that allows either party to enforce and remedy directly from the other party
Project Scope is a concise and accurate description of the end products or deliverables of the project and that meet agreed stakeholder requirements.
Make-or-Buy is a decision to produce the product in-house or to purchase from outside sources
Probability is the likelihood of occurrence.
Assumption is a factor that for planning purposes are considered to be true, real, or certain.
'; questions[43]='Contract is~a legal document of purchase or sale which is binding on both parties.~a provision in the project plan to mitigate cost and/or schedule risk.~any system used to monitor project costs by category ,e.g., labor, supplies, materials,.~the logical order of tasks that defines the sequence of work in a project.~a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.~A~1~1~
Brainstorming is a general creativity technique that can be used to identify risks using a group of team members or subject-matter experts.
Network is the logical order of tasks that defines the sequence of work in a project.
Reserve is a provision in the project plan to mitigate cost and/or schedule risk.
Chart of Accounts is any system used to monitor project costs by category ,e.g., labor, supplies, materials,.
Contract is a legal document of purchase or sale which is binding on both parties.
';